Doku Basis

One live project basis from request to energization.

Doku Basis connects the critical artifacts, systems, and decisions that deliver power infrastructure, so teams can understand impact, act earlier, and keep projects on schedule and on budget.

Project basis architectureOne live basis across the systems that move delivery.

Project basis

The single source of truth for the project, including assumptions, status, evidence, commitments, and reference data.

1. Grid studies & requirements

  • Interconnection position
  • Capacity analysis
  • Scenario management
  • Queue tracking

2. Engineering & design

  • Models & drawings
  • Protection & coordination
  • Iterative design control
  • Technical reviews

3. Long-lead equipment

  • Equipment data & availability
  • Vendor commitments
  • Lead times & risks
  • Alternatives

4. Approvals & agreements

  • Permits & regulatory
  • Utility approvals
  • Commercial agreements
  • Conditions tracking

5. Commissioning & acceptance

  • Test plans & protocols
  • As-built evidence
  • Punchlists & resolution
  • Acceptance records

Energization & operations

Confident energization. Handoff to operations with complete traceability.

Change impact engine

Every change is evaluated across the plan, cost, equipment, approvals, and commissioning, showing downstream impact before it becomes redesign, delay, or claim.

The decisions that move a project, made visible.

Each view is designed around an operating decision. The same basis connects project detail to schedule, capital, accountability, and closure.

Illustrative schedule and capital workspace with a critical path, capital exposure, and schedule risks
Schedule and capitalSee critical-path movement, capital exposure, and decisions due in the same operating view.
Illustrative long-lead equipment tracker with vendors, lead times, need-by dates, capital, and status
Long-lead equipmentTrack need-by dates, vendor commitments, lead times, status, and capital across equipment packages.
Illustrative approvals and evidence workspace with an approval chain, evidence package, and closure checklist
Approvals and evidenceKeep approvals traceable to requirements, owners, source records, and closure evidence.
Illustrative executive portfolio dashboard with schedule health, capital exposure, portfolio risks, and decisions
Executive visibilityReview project health, schedule pressure, capital exposure, and decisions requiring attention.
Engineering contextTechnical detail stays inspectable while consequences remain visible to the project team.

End-to-end visibility

See the full path to power and the critical path.

Earlier insight

Understand impact before committing.

Accountability

Clear owners, decisions, and audit trail.

Less risk & redesign

Reduce rework, disputes, and surprises.